九九大香尹人视频免费|91免费在线视频观看|久久精品国产99久久久|林ゆな国产一区在线播放|日韩精品无码久久久久成人|国产亚洲高清在线精品不卡|91国语自产拍在线观看亚洲|国产成人精品福利网站在线观看

Company news, industry news, technical support

How to install three roller brake reasonably Home > News >

How to install three roller brake reasonably


The installation of three roll gate is very important to the use effect of three roll gate and plays a decisive role in the acceptance of the whole project. The following problems should be paid attention to how to reasonably install three roll gate:

1、 Determine the scheme. When communicating with the customer, determine the scheme, the width and length of the site, and determine how many machines can be installed. Whether to select the vertical three roller brake or the bridge three roller brake. The overall dimension of the vertical three roller brake is 420x330x980 (mm), the overall dimension of the bridge three roller brake is 1200x280x1000 (mm), and the dimension from the three roller brake rod to the chassis is 510mm, that is, the floor area of the vertical three roller brake is 420x (330 + 510), The bridge three roller gate covers an area of 1200X (280 + 510). When determining the type selection, fully consider the gap between the gate machine and the gate rod, the floor area, placement position and wiring (open line or dark line) of each three roller gate. The scheme is determined and the goal is determined. Wait for the three roller gate to arrive at the site.

2、 Locate wiring. According to the previously determined scheme, specify the specific installation size of the three roller gate, and do a good job in the embedded pipe. Leave a 50-100mm gap between the gate machine and the gate machine. The upper cover can be opened to prevent the adjustment and maintenance of the machine. Do not leave a gap. Two 6-8 plastic pipes are embedded between the gate machine and the gate machine. One rubber pipe goes through the power line (strong current) and the other rubber pipe goes through the signal line (weak current), The power line and signal line shall not be run through one rubber hose at the same time, which will affect the communication effect. The embedded pipe shall be 30-40mm above the ground. The vertical three roller brake shall be at the middle bottom of the machine, and the bridge three roller brake shall be at both sides (because the middle bottom of the bridge three roller brake is closed).

3、 Fixed adjustment. The fixed bottom is fixed with 4-m10x100 expansion screw, which can not swing. The whole machine is horizontal and the appearance is consistent as a whole (it is best to pull a straight line with a thin line before fixing, which is consistent in vertical and horizontal directions). The three roll brake and the three roll brake are in series, adjusted one by one, and the straight line can be used normally.


商水县| 尖扎县| 阳东县| 济南市| 民丰县| 博爱县| 韶山市| 正定县| 关岭| 乾安县| 西乌珠穆沁旗| 临安市| 高碑店市| 沛县| 徐闻县| 北票市| 临安市| 阿合奇县| 丁青县| 寻甸| 安阳县| 阿勒泰市| 安庆市| 高尔夫| 陕西省| 姚安县| 景泰县| 南宁市| 英吉沙县| 青冈县| 元江| 广水市| 和政县| 稷山县| 西吉县| 和龙市| 含山县| 翁源县| 平和县| 乐清市| 巴马|